Courses / Departmental project 3

Course data
Code: BMEEPIPT711
Course requirements: Design Global Basic, Departmental Project 1
Final requirements: Participation in 70% of the lessons is set as a condition. Only the active practice counts for presence.
Credits:
Time: 8 hours practice
Coursemaster: Bartók István DLA
Instructors: Bartók István DLA
Szécsi Zoltán DLA
Árva József DLA
Description: DEPARTMENTAL PROJECT 3 FALL 2021
DEPARTMENT OF EXPLORATIVE ARCHITECTURE

HOMORÓDSZENTPÁL


INTRODUCTION

The project site for the Departmental Project 3 of the autumn semester of 2021 is going to be in
Homoródszentpál in Hargita County, Transylvania. The village with a couple of hundred inhabitants has
a very nice location, but now it is impoverished. Once the village lay on the line of the Roman Limes, and
despite being in the middle of present-day Romania, it is still in a peripheral position. In this special, multilayered
world, we are going to explore the architectural issues and possibilities of recycling, remodelling
and „healing” (reclaim). The specific design tasks will be different according to different situations and
sites. The detailed elaboration of these tasks will be completed at the beginning of the semester, but one
by one it will be a medium complexity, usually multifunctional and in any case eco- and energy-conscious
buildings, which are trying to breathe new life into the life of the settlement. The scale will range from the
infrastructure serving the future cycle path and the Transylvanian hiking trail to the industry 4.0 carpentry,
but a school as a community space is also included in the list.
The units on different plots may differ according to the programs finalized by the students, and the
functional programs can be modified and combined. Analyzing the existing complex environment and
understanding the connections is a very important part of the task. The floor area of the buildings to be
planned is approximately 600 m2 net. The semester begins with a description of the design locations,
followed by lectures detailing the broader context.

CONTENT AND FORMAL REQUIREMENTS

Concept design:
- layout 1:1000 (with site analysis, can be team work as well)
- presentation of building(s) of similar character as reference (3-4 A4 pages)
- elaboration of the design program, presentation of function
- scale-model, presentation of the basic design ideas (master plan, scheme function min. 1:500)

Preliminary design I.:
This design phase is already individual work, focusing on the development of the architectural form, of the relation between space and mass, of the relation with the surrounding, and of the interior functional system.
- site plan M=1:500, 1000
- plans of the different levels, sections, elevations M=1:200
- perspective views, sketches, scale-model with surroundings

Preliminary design II.:
The same as Preliminary design I., but only in case of unsuccessful presentation, or upon request.

Final project:
At the end of the semester detailed 1:100 documentation has to be prepared.
(simplified „program design”):
- site plan at a scale of M=1:200, 500 with surroundings (buildings, garden, streets, walking ways, entrances, delivery entrances, flooring)
- plans of all different levels with the name of the rooms marked 1:100 (exceptional case 1:200)
- at least 2 different sections showing the structural solutions, dimensions 1:100 (exceptional case 1:200)
- all facades with the used materials and 1:100 (exceptional case 1:200)
- perspective view with the surrounding, street view, photomontage
- Model min. scale M= 1:333 (paper, balsa wood, plexi) not obligatory in case of distance learning!

Formal requirements:
All drawings can be traditional hand- or CAD drawings or any other optional official scaled printed technique. Size, format, legend due to sample sheet given by the department. Beside the detailed documentation a compressed sheet of 59.4 x 178.2 cm of the project must be submitted as well. Submission is fulfilled with e-mail delivery, presentation is highly recommended, but not compulsory! The clear and correct technical presentation is important. A stable cover due to the plans dimensions with index is necessary. Models have to be submitted in boxes (in case allowed by measures due to COVID 19).The name and e-mail address of the author and the title of the project have to be marked on each plan, cover, model and box.

September 2021.

Nagy Iván DLA            Bartók István DLA       Vasáros Zsolt DLA
associate professor     associate professor    university professor
head of course            head of course            head of department

Schedule:
1.6th September 2021. Monday 10:15-14:00 K 393 Introductory lecture, registration 
9th September 2021. Thursday 10:15-14:00 K 393 Design study-research 
2.13th September 2021. Monday 10:15-14:00 K 393 Study-research, consultation 
16th September 2021. Thursday 10:15-14:00 K 393 Study-research, consultation 
3.20th September 2021. Monday 10:15-14:00 K 393 Elaboration of concept design, consultation 
23rd September 2021. Thursday 10:15-14:00 K 393 Elaboration of concept design, consultation 
4.27th September 2021. Monday 10:15-14:00 K 393 Elaboration of concept design, consultation 
30th September 2021. Thursday 10:15-14:00 K 393 Presentation of layout - concept design and complex study, evaluation 
5.4th October 2021. Monday 10:15-14:00 K 393 Elaboration of preliminary design, consultation 
7th October 2021. Thursday 10:15-14:00 K 393 1. additional presentation of concept design (only for students, who did not pass the first presentation) 
6.11th October 2021. Monday 10:15-14:00 K 393 Elaboration of preliminary design, consultation 
14th October 2021. Thursday 10:15-14:00, 15th October 2016. Saturday 10:15-14:00 K 393 Elaboration of preliminary design, consultation 
7.18th October 2021. Monday  Preliminary studio week 
21st October 2021. Thursday  Preliminary studio week 
8.25th October 2021. Monday 10:15-14:00  Presentation of preliminary design, evaluation 
28th October 2021. Thursday 10:15-14:00 K 393 Elaboration of final design, consultation 
9.1st November 2021. Monday  All saints 
4th November 2021. Thursday 10:15-14:00  Elaboration of final design, consultation 
10.8th November 2021. Monday 10:15-14:00 K 393 Elaboration of final design, consultation 
11th November 2021. Thursday 10:15-14:00 K 393 2. additional mid-term presentation of preliminary design (only for students, who did not pass the first presentation) 
11.15th November 2021. Monday 10:15-14:00 K 393 Elaboration of final design, consultation 
18th November 2021. Thursday 10:15-14:00 K 393 Elaboration of final design, consultation 
12.22nd November 2021. Monday 10:15-14:00 K 393 Elaboration of final design, consultation 
25th November 2021. Thursday 10:15-14:00 K 393 Elaboration of final design, consultation 
13.29th November 2021. Monday 10:15-14:00 K 393 Elaboration of final design, consultation 
2nd December 2021. Thursday 10:15-14:00 K 393 Elaboration of final design, consultation 
14.6-10th December 2021. Monday-Friday K 393 PROJECT FINALISATION WEEK 
10th December 2021. Friday 23:59 K 251 Project submission 
15.   
17th December 2021. Friday 23:59 K 251 Delayed submission (with late fee) 
Downloads
1 parking requirement.pdf (286 kB)parking requirement
2 lavatory requirement.pdf (40 kB)lavatory requirement
number of parking spaces.pdf (210 kB)
TT3_sheet_sample.psd (7354 kB)sample sheet
News
2017. 09. 21. 21:37
Dear dp3 Students,
as we agreed today we postpone the 1st mid-term presentation of concept design onto Monday 2nd October 10.15 am.
2016. 12. 07. 21:52
IMPORTANT CHANGE!


The official submission dates of Departmental Design 3 have changed:

submission: 12th December 2016. Monday 12:00, late submission: 16th December 2016. Friday 12:00!
2016. 11. 04. 14:57
Dear Students,
as I have sadly acknowledged only 3! of you have presented on Thursday, which was the additional occasion of mid-term presentation: the additional presentation of preliminary design. However I can offer you the next lesson 7th November 2016 Monday 10:15-14:00 as a post-additional presentation of preliminary design.
This is the last important compulsory occasion before the last submission, so you are mostly recommended to come and present your work! You have to pass all the preliminary presentations.
2016. 09. 04. 11:20
The project site for Departmental Project 3 of the autumn semester 2016 is Budakeszi, the just developing sub-centre of the town at the junction of Kossuth and Fő utca with the Cultural centre and Library nearby (parcel numbers: 1384-88 and 1392-93). Despite of advantageous circumstances the design site looks more like a suburban traffic junction, than an urban centre. The project consists of designing the layout concept of the block and different moderately complex eco- and energy-conscious public buildings for the plots defined by the concept. The programs are different, rating from a library to an office building for an IT company. The semester starts with the presentation of the programs and a site visit.

More information

here
2015. 06. 29. 10:02
Departmental Project 3 – Introduction

The project site for Departmental Project 3 of the autumn semester 2015 is Érdliget (see the site plan enclosed), where we will tackle with the examination and development of the subcentre. The design project consists of planning different moderately complex public buildings. The programs are different, rating from playhouse, sports club, beauty saloon, a hotel with 25 bedrooms and office building for an IT company. There will be different programs of ca. 800-1000 m2 depending on the size of the design sites.

More information
 here



Attachments:
Erdliget_site.doc (3680 kB)
Newer posts
Earlier posts